Power Equipment 2025-11-20

Indonesia Transformer Group Shipping Project

Project Overview

HY Breakbulk provided international shipping services for 20 large transformers for a power equipment company, departing from Shanghai Port and delivered in batches to three different ports in Indonesia.

Cargo Information

Item Details
Cargo Type Power Transformers
Quantity 20 units
Single Unit Weight 78 ~ 115 tons
Maximum Dimensions 6.2m × 3.8m × 4.1m
Port of Loading (POL) Shanghai Port
Ports of Destination (POD) Jakarta, Surabaya, Makassar, Indonesia

Shipping Plan

  • Vessel Type: Deck cargo vessel (dedicated for heavy-lift cargo)
  • Lashing Method: Steel base frame + four-corner lashing straps
  • Transshipment Port: Singapore (depending on POD batch)
  • Total Voyage Duration: Approximately 14 ~ 20 days

Key Measures

  1. Space locked 45 days in advance to avoid peak season space shortage
  2. Each transformer on an independent steel base frame, welded and secured to the deck
  3. Lashing status checked every 24 hours during voyage
  4. Consignee notified 72 hours in advance to prepare unloading equipment

Delivery Results

  • Zero cargo damage
  • 100% on-time arrival at port
  • Client placed follow-up batch orders

Project Photos

货物装船前检查

货物装船前检查

底座框架安装

底座框架安装

变压器固定中

变压器固定中

四角绑扎带安装

四角绑扎带安装

绑扎完成全景

绑扎完成全景

甲板固定状态

甲板固定状态

航行途中检查

航行途中检查

目的港卸货中

目的港卸货中

货物安全落地

货物安全落地

与收货方交接

与收货方交接

交付完成

交付完成

项目总结留档

项目总结留档